Completed 2010

Okanagan College Gym Roof and Walls

Architect
CEI
General Contractor
PCL
Our Service
Engineer of Record (Gerald Epp)
Engineer-Build
Sustainability
LEED Platinum
Location
Penticton, BC, Canada
Status
Completed 2010

This Living Building Challenge (LBC) project demonstrates the use of Composite Concrete-Timber (CCT) as gymnasium wall panels. The 30 pre-finished panels (about 12,000 sq.ft.) were fabricated in the shop complete with insulation, in-built radiant heat piping, and MEP rough-ins. The Roof consists of hybrid wood-steel trusses.